D GB F E196031-02.2015-DGbFengineering for a better world GEA Refrigeration TechnologiesGEA Bock Compressor HAX2 CO2 TAssembly instructionsHAX2/70-4
10 D GB F E96031-02.2015-DGbF4| Compressor assembly4.4 Flange shut-off valves (HP/LP)ATTENTION! The compressor must be depressurised through connecti
D GB F E1196031-02.2015-DGbF4| Compressor assembly• The compressor has a shut-off valve with multi-sided cutting ring for the safe installation of th
12 D GB F E96031-02.2015-DGbF5| Electrical connection 5 Electrical connection DANGER! Highvoltage!Riskofelectricshock!Onlycarryoutwor
D GB F E1396031-02.2015-DGbFINFO! Mechanicalstartunloaderwithbypasssolenoidisnotrequired.In the factory, the motor is switched for direct st
14 D GB F E96031-02.2015-DGbF5.3 Basic circuit diagram for part winding startFig. 19R1 Cold conductor (PTC sensor) motor windingR2 Thermal prot
D GB F E1596031-02.2015-DGbFQ1 Main switchM1 Compressor motorM1.1 Fan motorK1 Mains contactor (part winding 1)K2 Mains contactor (part w
16 D GB F E96031-02.2015-DGbF5| Electrical connection 5.4 Electronic trigger unit MP 10The compressor motor is tted with cold conductor te
D GB F E1796031-02.2015-DGbFOperation mode: The oil sump heater operates when the compressor is shut down. The oil sump heater is switched off when
18 D GB F E96031-02.2015-DGbF6| Commissioning6.1 Preparations for start-upINFO! In order to protect the compressor against inadmissible operating c
D GB F E1996031-02.2015-DGbF6| Commissioning First evacuate the system and then include the compressor in the evacuation process. Relieve the compr
2 D GB F E96031-02.2015-DGbFAbout these instructionsRead these instructions before assembly and before using the compressor. This will avoid misunder-
20 D GB F E96031-02.2015-DGbF6| CommissioningThecompressoristtedwithtwodecompressionvalves.Onevalveeachonthesuctionanddischargeside.
D GB F E2196031-02.2015-DGbF6.8 Avoid slugging ATTENTION! Slugging can result in damage to the compressor and cause
22 D GB F E96031-02.2015-DGbF7.1 Preparation7| MaintenanceWARNING! Beforestartinganyworkonthecompressor: Switch off the compressor and se
D GB F E2396031-02.2015-DGbF7.5 DecommissioningClose the shut-off valves on the compressor. CO2 does not need to be recycled and can therefore be blo
24 D GB F E96031-02.2015-DGbF8| Technical dataTypeNo. of cylindersDisplacement50/60Hz(14 50 / 1740 rpm)Electrical dataWeightConnections Oil c
D GB F E2596031-02.2015-DGbF9| Dimensions and connectionsSVDVSuction lineDischarge line see technical data, Chapter 8AConnection su
26 D GB F E96031-02.2015-DGbF10| Declaration of conformity and installationDECLARATION OF CONFORMITY CE 07for using the compressors within the Europea
D GB F E2796031-02.2015-DGbFDear customer,GEABockcompressorsaretop-quality,reliableandservice-friendlyqualityproducts. Ifyouhaveanyques
28 D GB F E96031-02.2015-DGbF96031-02.2015-DGbF © GEA Group AG. All rights reserved.GEA Refrigeration TechnologiesGEA Bock GmbHBenzstraße 7, 72636 Fr
D GB F E396031-02.2015-DGbFContents Page 1 Safety 4 1.1 Identicationofsafetyinstructions 1.2 Qualicationsrequiredofp
4 D GB F E96031-02.2015-DGbF1| Safety1.2 Qualicationsrequiredofpersonnel1.3 General safety instructionsWARNING! Inadequately qualied person
D GB F E596031-02.2015-DGbF1| SafetyThese assembly instructions describe the standard version of the HAX2 CO2 T manufactured by GEA Bock.The compres
6 D GB F E96031-02.2015-DGbF100/150 barHAX2/110-4 CO2 TAS30046A00226,7 A380-420V Y/YY9,66440-480V Y/YY175011,6665CO2,C 85 EY: 110 A Y: 141 AGEA Boc
D GB F E796031-02.2015-DGbF2| Product description2.2 Name plate (example)2.3 Typekey (example)¹) HG - Hermetic Air-Cooled (air-cooled) Fig. 3/Tra
8 D GB F E96031-02.2015-DGbF3 | Areas of application ATTENTION! Compressor operation is possible within the operating limits shown in the diagra
D GB F E996031-02.2015-DGbF4| Compressor assemblyINFO! Newcompressorsarefactory-lledwithinertgas(3barnitrogen). Leave this service charg
Kommentare zu diesen Handbüchern